Filter:   
Trucks Being Built
<< prev  
 of 15  next >>
CFE HBar Rounded Top
Pittsford Fire District
Being Built: Summer 2013

Pierce 100' Platform PUC, Velocity Chassis

Photo Album for Pittsford, NY Job 26720

September 17th, 2013

This week your apparatus completed aerial testing and 3rd party pump tests. At the time of this report your apparatus was released to final product evaluation which is part of the quality process. This is your last scheduled report.

Adobe PDF Logo
Download the Specifications Drawing
 
Wrights Corners Fire Company
Being Built: Spring 2013

Pierce Pumper, Velocity Chassis

Photo Album for Wrights Corners, NY

Job 26604 June 1st, 2013

This week alignment and initial testing finished. In the next few days your apparatus should be on the line where reflective striping and/or additional content is added. Early next week 3rd party pump testing should be completed. Your apparatus should then be released to final product evaluation which is part of the quality process. This is your last scheduled report.

Adobe PDF Logo
Download the Specifications Drawing
 
West Seneca Fire District No.6
Being Built: Spring 2013

Pierce Heavy Duty Rescue Pumper, Impel Chassis

Photo Album for West Seneca, NY Job 26590 June 1st, 2013

This week alignment and initial pump testing finished and some reflective striping was applied to your apparatus. In the next few days your apparatus should complete 3rd party pump testing, have any remaining content added and then be released to final product evaluation which is part of the quality process. This is your last scheduled report.

Adobe PDF Logo
Download the Specifications Drawing
 
CFE HBar Rounded Top
<< prev  
 of 15  next >>